Supplying equipment and implementation of the network connection plan of Foulad Tejarat Sadra
Supplying equipment and implementation of 33 KV underground line with burial sheath and manhole from Lashgar substation to dedicated substation of Ahvaz data center
The construction and equipping project of 33 kV ground substation of Ahvaz data center
Supply of goods and equipment, implementation of construction, transformer and cabling of Sadra Tejarat Steel Company
Engineering services, supply of goods and equipment, construction of ground post building and installation of equipment of Sadra Tejarat Steel Company
Providing consulting services, designing, following up on administrative matters and monitoring the implementation of power supply to the data center in Ahva
Loading and transporting transformers
Supply of medium pressure cables
Medium pressure cabling
Forming and arranging the cables in the channe
Piping for cable passage
Installation of medium pressure panels
Implementation of fencing inside the post
Electrification of power transformers
Installation of jacket and lightning arrester
Implementation of final connections
Connecting the power post to the network
Excavation
Picking up rubble
Substation floor concreting
Reinforcement
Execution of columns
Roof reinforcement
Slope and parapet
Door painting
Transportation and installation of the trans room door
Trans room door painting
Isogam implementation
Roof pitch
Implementation of the external view of the pos
Post building
Installing the entrance door microswitch
Installation of fire extinguishers
Asphalt cutting
Start of drilling operations
manhole drilling
Carrying and placing manhole
Manhole installation
Manhole placement
Filling around the manhole with a mixture of soil and lime
Digging a trench
Carogate pipe installation
Concreting
The quality of the implemented bank conduit
Installation of three rows of danger tape
Loading, transporting and unloading cables
Cutting the extra part of the pods for sealing
Manhole cleaning
Cleaning and sealing manholes
Detailed execution and cables
Insulation of cables entering the manhole by foam
Cabling operation along the route
Isogam of the space between manhole doors along the line
Concreting on the manhole door
Start of network implementation
Concreting around the foundations
Cutting and starting the tabulation operation
The start of the paving of the sidewalk of Enghelab St
Network optimization
Installation of reclosers and feeder connection to the network
Paving of the sidewalk of Enghelab St
Dismantling the workshop
drilling
Foundation reinforcement
Installation and adjustment of base plates with mapping camera
Preparing a mixture of copal and lime
Concreting
Implementation of scaffolding
Column reinforcement
Column formatting
Implementation of the ceiling
Roof concreting
Implementation of two layers of Izogam on the roof and parapet walls
Floor and wall isogam of channels
Implementation of channel walls
Implementation of the inner wall of the channels
Plastering the walls of the channels
Implementation of internal walls
Implementation of surrounding walls using blocks
Installation of door frames
Work facade of the outer parts
Installation of post doors
Implementation of false ceiling
Installing the transformer in the power station
Preparation and painting of air conditioner canopy
high pot test
Installation of fire alarm system
Installation of air conditioner
Supply of power supply equipment to Isfahan Zob Steel Complex
Medium pressure cable supply
Start of drilling operations
Digging with a trencher
Draining the trench
piping
Collect waste and excess soil
Restoration and filling
The optical fiber design project of the path of Holy Shrine in the area of Azadi Center
drilling
drilling
Digging with a trencher
cutting
Start of cabling operation
Cabling
Fiber optic junction box
Concreting
Concreting
Part of the excavation route
Cabling
Concreting
Garbage collection
Cleaning the drilling site
Washing the drilling site
FTTH Network Development Project (Elahia-Mahdieh Street) of Shahid Bahonar Telecommunication Center